InfoisInfo Australia

Australian Water Project Management
Project Management in Camden

www.awpm.com.au
Show phone number
Remember you found this company at Infoisinfo 2-4648066?

Address

Unit 13, 151 Hartley Rd. Smeaton Grange. Camden, NSW, 2567.
Show map


Are you the owner or manager of this company?



What you should know about Australian Water Project Management

Business Management in Camden, Management Consultants in Camden, Business Consultants in Camden, Business Consulting in Camden

wpm prides itself on the fact that we can present all services (One Cease Shop). The following tasks are carried out as piece of our Project Management service: Major Works Coordination of design, quality assurance, programming, design reviews, supervision of construction, tendering for construction, lodgement of documentation and liaison with Developers. Peaceful Works Supervision of construction, tendering for construction, lodgement of documentation and liaison with Developers. Prides itself on the fact that we can present all services. The latter tasks are carried out as portion of our design service: As each project varies in design requirements we interrogate that you bear a copy of your site plan so we may yield an flawless quotation on your project. wpm is a Sydney Water accredited company for the Peaceful and Major Works Construction categories. All labor needed to be carried out on Sydney Water's wealth must be done by a Sydney Water listed Supplier. You will be required to pay for and book Inspections or Supervisions with wpm. PierSite Inspections are needed to ensure the piers on your development are definite of the Zone of Persuade as per your approved plans. An accredited Sydney Water supplier is required to carry out this inspection and it must be booked before to the footingsfoundationsconcrete being poured. Concrete Encasement Supervision is needed to ensure that the pipes are in good condition and to ensure the correct materials are used and the labor is carried out to Sydney Water’s standards. You may be needed to have the section of pipe to be encased replaced at your cost, prior to the encasement taking place. An accredited Sydney Water supplier is needed to carry out the Definite Encasement. An accredited Sydney Water supplier is required to carry out the Concrete Encasement Supervision of the works and it must be booked prior to the tangible being poured. We are also accredited to carry out the definite encasement works. Accredited Key Personnel to carry out and confirm PierSite Inspections. You will be needed to pay for and book a Definite Encasement Supervision if you are tangible encasing Sydney Water’s assets. Sewer and potable water construction to service the 156 lot subdivision. Sewer and potable water construction to service the 105 lot subdivision. Sewer and potable water construction to service the 90 lot subdivision. Sewer and potable water construction to service the 60 lot subdivision. Sewer and potable water construction to service the 57 lot subdivision.
Read more...

Social media

We don't have any social media account of this company

Services

wpm is accredited with Sydney Water in the succeeding fields: Prides itself on the fact that we can offer all services (One Cease Shop). Prides itself on the fact that we can donate all services. You do not need a Section 73 Certificate if you are constructing a house which is replacing an existing dwelling or altering extending a house (but you should get your building plans checked and stamped at a Speedy Check outlet or if in the zone of influence, at a Water Service Coordinator office). Extensions or amplifications to Sydney Water’s systems) to ensure your development has correctly sized mains available for connection. Your local council requires a Development Application unless your proposal is exempt. Maximum developments affect Sydney Water’s water ardor sewer systems. A Coordinator can also undertake the project management, design and construction of any needed works. The Coordinator will communicate electronically with Sydney Water correct through the certification process. If you plan an unsubdivided dual occupancy, you should consider requirements for tomorrow subdivision. This can avoid additional costs such as moving newly laid services. The Notice will be based on an assessment of your proposal and it’s impact on Sydney Water’s systems. If applying prior receiving consent, an advice called a Letter Pending Development Consent will identify what to do if your application is approved. Developer charges: Developer charges are a contribution toward Sydney Water’s water and sewer headwords and major works. These charges convalesce your share of Sydney Water’s costs in servicing the area of your development. Charges for a development can amount to thousands of dollars, depending on the size and location of the project. You must engage a licensed Coordinator to facilitate the design and construction of the works at your cost. Your Coordinator then project manages the works. Once the works are completed satisfactorily, they are taken over as piece of the Sydney Water system. Permit considerable time for this process. If works need to be built, certification will depend on how long the works receive to be constructed and taken over by Sydney Water. Plumbing and drainage inspection and connection fees Ag. Fees for assessing water mains for fire fighting capabilities. Prides itself on the fact that we can give all services.
Read more...

Photos and videos

This business has no pictures or videos

Reviews of Australian Water Project Management (0)

Do you own a business?
We help you grow it

Get more clients, visibility and branding.
Let us help you achieve your targets and improve your business.

Add your company